Skip to Content
InternalDocsOperationsP11 H Public Launch Go No Go Packet

P11 H Public Launch Go No Go Packet

Source: docs/operations/p11-h-public-launch-go-no-go-packet.md

# P11-H Public Launch Go/No-Go Packet **Owner:** Dan **Created:** 2026-02-24 **Status:** Draft **Plan ID:** P11-H --- ## 1. Decision Summary | Field | Value | |---|---| | Decision state | Pending | | Scope | Public self-serve + AI-agent API launch | | Target decision date | 2026-03-03 (after 7-day canary window) | | Launch window | Proposed: 2026-03-03 16:00-20:00 UTC (finalized at go/no-go meeting) | | Rollback authority | Dan (technical execution); product lead sign-off for external comms | | Primary approvers | Product lead, engineering lead | --- <!-- BEGIN: AUTO_LAUNCH_STATE --> ### Automated Launch State (Generated) _Last refreshed (UTC): 2026-02-25T01:52:28.837237Z_ | Signal | Value | |---|---| | Consecutive scheduled canary successes | 4 | | Canary streak start | 2026-02-24T22:28:38Z | | Projected 7-day gate completion | 2026-03-03T22:28:38Z | | P11-F gate met | No | | Latest canary failure in window | 2026-02-24T21:56:27Z | | Latest staging-health result | success (2026-02-25T01:07:47Z) | | Latest FORCE-RLS result | success (2026-02-24T14:43:05Z) | Recent scheduled canary evidence: - 2026-02-25T01:20:22Z — `success` — https://github.com/rgl8r/platform/actions/runs/22377739347 - 2026-02-24T23:52:50Z — `success` — https://github.com/rgl8r/platform/actions/runs/22375335238 - 2026-02-24T23:00:10Z — `success` — https://github.com/rgl8r/platform/actions/runs/22373790616 - 2026-02-24T22:28:38Z — `success` — https://github.com/rgl8r/platform/actions/runs/22372837122 - 2026-02-24T21:56:27Z — `failure` — https://github.com/rgl8r/platform/actions/runs/22371780757 - 2026-02-24T21:01:05Z — `failure` — https://github.com/rgl8r/platform/actions/runs/22369883607 <!-- END: AUTO_LAUNCH_STATE --> ## 2. Gate Evidence Matrix | Gate | Status | Evidence | |---|---|---| | P11-A | Complete | PR [#392](https://github.com/rgl8r/platform/pull/392), required `api-contract-gate` on `main` | | P11-B | Complete | PR [#421](https://github.com/rgl8r/platform/pull/421), public API contract pack | | P11-C | Complete | PR [#422](https://github.com/rgl8r/platform/pull/422), AI-agent integration kit | | P11-D | Complete | PR [#424](https://github.com/rgl8r/platform/pull/424), idempotent enqueue behavior | | P11-E | Complete | PR [#425](https://github.com/rgl8r/platform/pull/425), quotas/rate limits/abuse guardrails | | P11-F | In progress | PR [#426](https://github.com/rgl8r/platform/pull/426), canary workflow `public-api-canary.yml` clean window in progress (started 2026-02-24) | | P11-G | Complete | PR [#429](https://github.com/rgl8r/platform/pull/429) + PR [#438](https://github.com/rgl8r/platform/pull/438), [`docs/operations/public-api-launch-runbook.md`](../operations/public-api-launch-runbook.md), [`docs/operations/p11-g-tabletop-evidence-2026-02-24.md`](../operations/p11-g-tabletop-evidence-2026-02-24.md) | | P11-H | In progress | This packet; final signatures pending | --- ## 3. Blocking Preconditions Before GO - [ ] P11-F canary has 7 consecutive clean days ending on or after 2026-03-03. - [x] P11-G tabletop follow-up "startup smoke test in CI (import all entry points)" is closed (PR [#438](https://github.com/rgl8r/platform/pull/438)). - [x] Launch week on-call roster is finalized and acknowledged by owners. - [x] Rollback authority is explicitly assigned and acknowledged. --- ## 4. Current Risk Register | Risk | Severity | Status | Owner | Mitigation | |---|---|---|---|---| | Canary window not complete yet | BLOCK | Open | platform-oncall | Continue scheduled canary runs; capture 7-day evidence in this packet | | Startup smoke test follow-up from tabletop | MED | Closed | Dan | Implemented via PR [#438](https://github.com/rgl8r/platform/pull/438) | | `logIntegrationAuthFailure()` pre-auth audit writes are best-effort under FORCE RLS | LOW | Open | Dan | Track in backlog; structured logs already capture failed auth attempts | --- ## 5. Launch Window and Ownership | Role | Owner | Backup | Contact | |---|---|---|---| | Launch commander | Dan | None (escalate to vendor/contractor as needed) | `#rgl8r-ops` | | Primary on-call | Dan | None (escalate to vendor/contractor as needed) | `#rgl8r-ops` | | Engineering escalation lead | Dan | None (escalate to vendor/contractor as needed) | `#rgl8r-ops` | | Comms owner | Dan | None | `#rgl8r-ops` | Rollback authority for launch window: Dan — authorized for all technical rollback levers in [`docs/operations/public-api-launch-runbook.md`](public-api-launch-runbook.md). Product lead sign-off required before external customer comms (incident notifications, status page updates). --- ## 6. Approval Record | Approver | Role | Decision (GO/NO-GO) | Timestamp (UTC) | Notes | |---|---|---|---|---| | Product lead (TBD) | Product lead | Pending | Pending | | | Dan | Engineering lead | Pending | Pending | | Final decision: Pending. --- ## 7. Decision Outcome Actions ### If GO 1. Announce launch start in `#rgl8r-ops` with launch window + owners. 2. Keep canary and staging health monitors active through launch window. 3. Post first-hour and 24-hour health summaries in `#rgl8r-ops`. ### If NO-GO 1. Document blocker(s) and explicit owner + due date in this packet. 2. Keep assisted-launch mode only ([`docs/runbooks/assisted-public-launch-checklist.md`](../runbooks/assisted-public-launch-checklist.md)). 3. Schedule next go/no-go review date before closing meeting.