P11 H Public Launch Go No Go Packet
Source: docs/operations/p11-h-public-launch-go-no-go-packet.md
# P11-H Public Launch Go/No-Go Packet
**Owner:** Dan
**Created:** 2026-02-24
**Status:** Draft
**Plan ID:** P11-H
---
## 1. Decision Summary
| Field | Value |
|---|---|
| Decision state | Pending |
| Scope | Public self-serve + AI-agent API launch |
| Target decision date | 2026-03-03 (after 7-day canary window) |
| Launch window | Proposed: 2026-03-03 16:00-20:00 UTC (finalized at go/no-go meeting) |
| Rollback authority | Dan (technical execution); product lead sign-off for external comms |
| Primary approvers | Product lead, engineering lead |
---
<!-- BEGIN: AUTO_LAUNCH_STATE -->
### Automated Launch State (Generated)
_Last refreshed (UTC): 2026-02-25T01:52:28.837237Z_
| Signal | Value |
|---|---|
| Consecutive scheduled canary successes | 4 |
| Canary streak start | 2026-02-24T22:28:38Z |
| Projected 7-day gate completion | 2026-03-03T22:28:38Z |
| P11-F gate met | No |
| Latest canary failure in window | 2026-02-24T21:56:27Z |
| Latest staging-health result | success (2026-02-25T01:07:47Z) |
| Latest FORCE-RLS result | success (2026-02-24T14:43:05Z) |
Recent scheduled canary evidence:
- 2026-02-25T01:20:22Z — `success` — https://github.com/rgl8r/platform/actions/runs/22377739347
- 2026-02-24T23:52:50Z — `success` — https://github.com/rgl8r/platform/actions/runs/22375335238
- 2026-02-24T23:00:10Z — `success` — https://github.com/rgl8r/platform/actions/runs/22373790616
- 2026-02-24T22:28:38Z — `success` — https://github.com/rgl8r/platform/actions/runs/22372837122
- 2026-02-24T21:56:27Z — `failure` — https://github.com/rgl8r/platform/actions/runs/22371780757
- 2026-02-24T21:01:05Z — `failure` — https://github.com/rgl8r/platform/actions/runs/22369883607
<!-- END: AUTO_LAUNCH_STATE -->
## 2. Gate Evidence Matrix
| Gate | Status | Evidence |
|---|---|---|
| P11-A | Complete | PR [#392](https://github.com/rgl8r/platform/pull/392), required `api-contract-gate` on `main` |
| P11-B | Complete | PR [#421](https://github.com/rgl8r/platform/pull/421), public API contract pack |
| P11-C | Complete | PR [#422](https://github.com/rgl8r/platform/pull/422), AI-agent integration kit |
| P11-D | Complete | PR [#424](https://github.com/rgl8r/platform/pull/424), idempotent enqueue behavior |
| P11-E | Complete | PR [#425](https://github.com/rgl8r/platform/pull/425), quotas/rate limits/abuse guardrails |
| P11-F | In progress | PR [#426](https://github.com/rgl8r/platform/pull/426), canary workflow `public-api-canary.yml` clean window in progress (started 2026-02-24) |
| P11-G | Complete | PR [#429](https://github.com/rgl8r/platform/pull/429) + PR [#438](https://github.com/rgl8r/platform/pull/438), [`docs/operations/public-api-launch-runbook.md`](../operations/public-api-launch-runbook.md), [`docs/operations/p11-g-tabletop-evidence-2026-02-24.md`](../operations/p11-g-tabletop-evidence-2026-02-24.md) |
| P11-H | In progress | This packet; final signatures pending |
---
## 3. Blocking Preconditions Before GO
- [ ] P11-F canary has 7 consecutive clean days ending on or after 2026-03-03.
- [x] P11-G tabletop follow-up "startup smoke test in CI (import all entry points)" is closed (PR [#438](https://github.com/rgl8r/platform/pull/438)).
- [x] Launch week on-call roster is finalized and acknowledged by owners.
- [x] Rollback authority is explicitly assigned and acknowledged.
---
## 4. Current Risk Register
| Risk | Severity | Status | Owner | Mitigation |
|---|---|---|---|---|
| Canary window not complete yet | BLOCK | Open | platform-oncall | Continue scheduled canary runs; capture 7-day evidence in this packet |
| Startup smoke test follow-up from tabletop | MED | Closed | Dan | Implemented via PR [#438](https://github.com/rgl8r/platform/pull/438) |
| `logIntegrationAuthFailure()` pre-auth audit writes are best-effort under FORCE RLS | LOW | Open | Dan | Track in backlog; structured logs already capture failed auth attempts |
---
## 5. Launch Window and Ownership
| Role | Owner | Backup | Contact |
|---|---|---|---|
| Launch commander | Dan | None (escalate to vendor/contractor as needed) | `#rgl8r-ops` |
| Primary on-call | Dan | None (escalate to vendor/contractor as needed) | `#rgl8r-ops` |
| Engineering escalation lead | Dan | None (escalate to vendor/contractor as needed) | `#rgl8r-ops` |
| Comms owner | Dan | None | `#rgl8r-ops` |
Rollback authority for launch window: Dan — authorized for all technical rollback levers in [`docs/operations/public-api-launch-runbook.md`](public-api-launch-runbook.md). Product lead sign-off required before external customer comms (incident notifications, status page updates).
---
## 6. Approval Record
| Approver | Role | Decision (GO/NO-GO) | Timestamp (UTC) | Notes |
|---|---|---|---|---|
| Product lead (TBD) | Product lead | Pending | Pending | |
| Dan | Engineering lead | Pending | Pending | |
Final decision: Pending.
---
## 7. Decision Outcome Actions
### If GO
1. Announce launch start in `#rgl8r-ops` with launch window + owners.
2. Keep canary and staging health monitors active through launch window.
3. Post first-hour and 24-hour health summaries in `#rgl8r-ops`.
### If NO-GO
1. Document blocker(s) and explicit owner + due date in this packet.
2. Keep assisted-launch mode only ([`docs/runbooks/assisted-public-launch-checklist.md`](../runbooks/assisted-public-launch-checklist.md)).
3. Schedule next go/no-go review date before closing meeting.